Pole Barn 3: floor prep
Installing vertical 2" foam pieces around the perimeter, 16" deep
Aug 14
It looks like Andrew did the roughed-in plumbing.
(We hired a friend) Aug 15
Here's the dividing wall between heated/insulated
shop/living-quarters and cold storage.
Randy leveling/smoothing the sand-gravel and laying
that pile of 2" 4x8 under-slab insulating foam Aug 20
On a beautiful morning we all helped install PEX tubing for the in-floor heat!
The gray pipes on the right are the entrances/exits for the PEX tubing.
Aug 22
Here's our road map Randy and I drew up the night before.
3 loops of ~275' each. Each loop meanders throughout
the whole floor, and none of them can cross.
It would have been a frustrating morning without the map.
First "loop" is in!
Randy and Teddy installing the 3rd loop to fill in the gaps
Bridget "overseeing"
3 loops in
Next goes wire reinforcing mesh on top of the tubing.
We have good helpers!
A professional team.
Ready for concrete!













Your kids at the worksite reminds me of you and your siblings when your parents' house was being built years ago!
ReplyDelete